| Department of Commerce |
Major refit of electrical and fire detection to Kariong Juvenile Justice Centre and Frank Baxter Juvenile Justice Centre. This has involved special security clearance and working in close proximity with staff and detainees. Total Electrical Value (1999-2001) $360,000.00
|
| Vos Constructions |
Deisgn and installation of all electrical services, fire detection, EWIS and exit and emergency lighting for new premises at Erina, NSW. Total Electrical to date (2000-2001) $280,000.00
|
| Engineered Fire and Safety Solutions Pty Ltd |
Fire upgrade projects for Engineered Fire and Safety which included the installation of fire detection systems and emergency and exit lighting systems.
|
| Taylor Group Constructions Pty Ltd |
Design and construction work for this company for 20 years. Projects range from substantial architectural designed residences to high rise office blocks and multiple warehouse complexes. Project values range from $5000.00 to $300,000.00
|
| Brimac Pty Ltd |
Brimac is a hazardous goods storage facility. Master Electrical designed and constructed the installation of general lighting, power, data cabling, hazardous location of lighting and installation of full fire detection and evacuation systems. Total Electrial Value (1997-1999) $192,000.00
|
| Top Hat Fine Foods Pty Ltd |
Designed and installed a new emergency and exit lighting system throughout the production and office areas. Total Electrical Value (1996-2001) $350,000.00
|
| Specialty Cereals Pty Ltd |
Master Electrical designed and installed various PLC based control systems and also maintain a 24 hour call out service on all process and production equipment. Total Electrical Value (1995-2001) $220,000.00
|
| Avant Couriers |
Design, supply and install a computer backup diesel generating set complete with maintenance program on the roof of a three storey building in North Sydney. The Generator was to provide backup power to the computer based operations systems.
|
| Telstra Australia |
Master Electrical has carried out various work for Telstra since 1979. Some of the works include: - Installation of gas detection systems in cable pits in various exchanges. - Installation of power supplies to Microwave Transmission Towers. - Installation of rural computer linked lighting surveillance equipment. - General light and power installation and maintenance. - Main switchboard and consumer mains replacements and repairs and upgrades to distribution networks in various telephone exchanges.
|